Computer Support Forum

cant get into my bios to change order

Question: cant get into my bios to change order

im using windows 2000 pro on a dell latitude cp laptop i think i tried everything when i restart it and hit f1 or f2 it just starts loading window it just bypasses by everyuthing and starts windows any help is appreciated

Relevance 100%
Preferred Solution: cant get into my bios to change order

I recommend downloading and running Reimage. It's a computer repair tool that has been proven to identify and fix many Windows problems with a high level of success.

I've used it in the past to identify and fix everything from blue screens (BSOD's), ActiveX errors, corrupt files and processes, dll/exe/sys errors, recover lost memory, Windows update problems, defragging, malware removal etc.

You can download it direct from this link http://downloadreimage.com/download.php. (This link will automatically start a download of Reimage that you can save to your computer.)

Answer: cant get into my bios to change order

Hi try Dell Latitude Fn+F1 (while booted)
http://www.michaelstevenstech.com/bios_manufacturer.htm

1 more replies
Relevance 68.47%

So I'm having a dual boot system (Windows and Ubuntu) and since I disassembled my laptop some hours ago the laptop boots directly into Windows (ignoring the GRUB OS selection screen).

I'm having a Lenovo Laptop with Windows 10 (Insider Preview) and a Samsung EVO 840 SSD on which my both OSs are installed.

When booting into BIOS I can't change the order of booting (Windows is stuck at the 1st position).

Any idea on how to solve this?

More replies
Relevance 68.47%

So I'm having a dual boot system (Windows and Ubuntu) and since I disassembled my laptop some hours ago the laptop boots directly into Windows (ignoring the GRUB OS selection screen).

I'm having a Lenovo Laptop with Windows 10 (Insider Preview) and a Samsung EVO 840 SSD on which my both OSs are installed.

When booting into BIOS I can't change the order of booting (Windows is stuck at the 1st position).

Any idea on how to solve this?

Answer:Can't change BIOS order

You need to update the boot file location.

I use rEFInd not grub so (from Windows Administrator command prompt) I run this whenever Windows resets it which it does on occasion.
Code:
bcdedit /set {bootmgr} path \EFI\refind\refind_x64.efi

You probably want to do something like this (again from windows command prompt).
Code:
bcdedit /set {bootmgr} path \EFI\ubuntu\grubx64.efi

If you can't remember or don't know where you installed grub (or what the name is) then mount the ESP and have a look - your loader will be in the EFI directory somewhere.

more replies
Relevance 67.65%

Hi all,
I have an old Dell laptop that is currently running Windows XP, but I'd like to install Linux on it. So I went into the BIOS, revision A14, and got to the page that changes boot order, so I can boot from CD. It says to use the right and left arrow keys to change it, but they don't do anything. So I am stuck with having to boot from floppy which I can't do for unrelated reasons. Any ideas on why I can't change this? The keyboard works fine, I can change other settings, just not this. Or am I totally missing something? Any help would be appreciated.
 

Answer:Can't change boot order in BIOS

Try moving to the selection you want and hit enter.
That might give you a selection window.
If not try + and -.
Page up and page down also works on some.
 

2 more replies
Relevance 67.65%

I have a new ssd with a copy of windows 10 installed onto it, the only issue is that the machine I need to install it on, doesn't have a change boot order within the BIOS.
Am I missing something? Or do I have to upgrade to a later BIOS version?
Thanks in advance
Zak

More replies
Relevance 67.65%

Mod Edit:  Split from http://www.bleepingcomputer.com/forums/t/559747/bios-changing-boot-order/#entry3841096 - Hamluis.
 
Hello
I have problem of could not change boot order to DVD on windows 7 my laptop is Dell inspiron 15R

Answer:Cannot Change Boot Order in BIOS

Please do the following.  This will provide me with the name of the BIOS manufacturer and its version.
 
Please download and install Speccy to provide us with information about your computer.  Clicking on this link will automatically initiate the download. 
 
When Speccy opens you will see a screen similar to the one below.
 

 
Click on File which is outlined in red in the screen above, and then click on Publish Snapshot.
 
The following screen will appear, click on Yes.
 

 
The following screen will appear, click on Copy to Clipboard.
 

 
In your next post right click inside the Reply to Topic box, then click on Paste.  This will load a link to the Speccy log.

8 more replies
Relevance 67.65%

I have 2 sata slots on my Motherboard so I put in a 160 gig hard drive with windows xp worked fine. Now I have one 40 gig IDE harddrive I wanted to put in just as a storage drive.(This computer has both Sata and IDE) computer reboots sees both drives I press F10 or 9 to continue . Then the screen goes black. I know whats happening,, Its reading the IDE to boot from and it doesnt have an O.S. on it. I want it to boot from the sata drive, SO I go into bios to change the boot order.. Every thing including the time is not letting me change it. Bios lock down ... Now I remember going into bios last year and I was able to change settings . Something happened! Now I cant change it. I even pulled out the dvdrom and put the IDE on the ribbon and power.... I heard that might fix the problem on another message board. SAME Problem. I see people with similar problems and the answer is to flash the bios,,, I have been reading about flashing bios and everyone says don't do it if you don't know what your doing. (PAPER WEIGHT IF DONE WRONG) Some one give me some advise and please something that helps !! I have heard so many dumb things to do I'm about to give up.

Answer:Can't change boot order in bios

Do NOT flash the BIOS! What type of keyboard are you using - PS/2, USB or wireless?

6 more replies
Relevance 67.65%

I have read many of the posts here on this subject. I have Googled and read many inputs on how to solve this problem. None of these have worked for me.
Here are some of my system specs:





Dell Inspiron 17R 5721
OS Name Microsoft Windows 8 Version 6.2.9200 Build 9200

Processor Intel(R) Core(TM) i7-3517U CPU @ 1.90GHz, 2401 Mhz, 2 Core(s), 4 Logical
BIOS Version/Date Dell Inc. A03, 10/24/2012
SMBIOS Version 2.7
Embedded Controller Version 1.01
BIOS Mode UEFI

Secure Boot State On

Boot Device \Device\HarddiskVolume1

Installed Physical Memory (RAM) 8.00 G



As so many others have written, I can't change the boot-up order which means at this time, I can only boot from the hard disk.
I am hopeful that it is my ignorance that prevents me from accessing and changing the order, and that some good hearted soul will set my down the right path.

Thanks
James

Answer:How to change the BIOS boot order?

Are you having trouble getting to UEFI/BIOS? Try turning fast startup off: Fast Startup - Turn On or Off in Windows 8. If you have tried this approach, then please tell us what else you have tried.

9 more replies
Relevance 67.65%

Here's a video demonstration:

It's acting as if the left and right arrow keys don't exist, even though they work fine in Windows XP. I want to boot off of DVD drive.

Sent from my SAMSUNG-SM-G920A using Tapatalk
 

Answer:Can't change boot order in BIOS

Post a screen shot of the screen you move the video to fast for me to see what the keys are. Have you referred to the manual?

Some are
Page Up
Page Down
F5
F6
Enter (then select the one)
 

9 more replies
Relevance 67.65%

Recently, my BIOS has started to display ' view only item '; this means I can't change my boot order and few other things as well. Has any one seen this problem before ? I would appreciate some help.Many thanks, Colin

Answer:BIOS - can't change boot order.

Seen it for audio and graphics cards usual trick is to disable in device manager first before trying to change in BIOS.Never seen it for boot order though.

5 more replies
Relevance 67.24%

This is the first time I've seen a computer with a boot order that can't be changed. It's a rebuilt Dell E520. When I go to the bios, it lists about 7 changes that can't be made, and one is the boot order. It boots the HD first and the CD/Rom second. period! So is there some other way I can run the Reinstallation CD so I can repair whatever it is that's making this machine seem like it's got the FengXing Infection? Thanks, Bahb
 

Answer:Solved: Can't change boot order in Bios

7 more replies
Relevance 67.24%

I have a Gigabyte Ultra Durable 3 motherboard MA785GM-USTH. I have tried several times to set the BIOS to boot first from a cd/dvd. It does not change the boot order. I continues to boot from my hard drive. I want to boot from a UBUNTU CD and I can't. Can someone help?
 

Answer:My Gigabyte BIOS won't change the boot order

My short answer here to this, is that it sounds like your BIOS needs a swift kick in the pants! Maybe the BIOS just needs a jump start, maybe to get things back on track. This is just a real quick little fix, if it works.

1. Remove the computer from power, unplug the power cord from the power supply.

2. Take the side panel off your computer case, exposing the guts of the machine.

3. Look for the motherboard, then look for a small shiny chrome colored battery.

4. Remove that chrome colored battery off the motherboard.

5. With the battery removed, take your hand and press the (power) button on the front of the case.

6. Keep that button depressed and or pushed for approx. 30 to 40 seconds, while your computer BIOS is drained of it's power and hopefully it's current setting.

7. Let off the (power) button, replace the chrome battery back onto the motherboard, replace the side panel of the case and reconnect the computer power cord to the back of the power supply.

Now turn on your computer and see if that helped take care of some things! Again, this is just one of those quick fixes that may or may not always work.

Hope this helps.
 

2 more replies
Relevance 67.24%

Hello everyone,
 
I need some help, I have a Lenovo ThinkCentre A55 9636 Desktop, and I need to boot off a CD but when I insert the CD in the CD/DVD-ROM and restart, it won't boot of the CD, it doesn't even give a message at startup to change the boot sequence (like press F2 for boot) or something like that. any help would be greatly appreciated.
 
thanks,
 
 
Mod:  edited the capitalization in the Subject line













Solved!

Go to Solution.

Answer:How to change Boot order on a ThinkCentre (BIOS)

did you try changing the boot order in the bios?     Message Edited by vijaysaradhi on 05-18-2009 08:34 AM

9 more replies
Relevance 67.24%

Hey guys,

My PC is running Windows 7. In the past I never had an issue running memtest from my CD. I would put the CD into the PC, restart the PC, press a certain key (I think) and Memtest would load.

Unfortunately I forgot what key I used to press and Memtest won't load, it goes straight to the Windows Startup Screen and the Desktop loads.

I went into Bios and I saw that CD/DVD was not #1 in the boot order which is strange because I used to run memtest many times on this PC and I never changed the Boot order.

I tried changing the boot order by hitting the + key but the key won't do anything. Is there some other key that I need to press in order to get + or - working?

also I see two CD/DVD's in the boot order of the Bios, I guess it's because I have two CD/DVD drives? Which one do I make #1? The Memtest disc is in the bottom CD/DVD drive.

Any help is much appreciated
 

Answer:Can't change boot order in Bios to run Memtest

Usually Memtest starts automatically without any key presses if your CD/DVD drive is 1st device.

What brand and model motherboard are you using? Usually it tells you at the bottom of the screen in the BIOS what keys you have to press to navigate through the menus. The manual probably explains it in great detail, but I know, who reads those things?

We aren't going to be able to tell you which drive is which, you will just have to try trial and error with at most 2 restarts.
 

3 more replies
Relevance 67.24%

I want to change the boot order to allow bootup from iso disks.Keyboarding F10 at doesn' t bring up the BIOS screen, and the machine just boots into  Win7. Any suggestions?Thanks

Answer:Can' t enter BIOS to change boot order

@ZL1BNB?, welcome to the forum. Try using the Esc key to see if that works.

2 more replies
Relevance 67.24%

My dv6 has a shattered LCD screen, but works otherwise.  I'd like to get into the BIOS and change the boot order so that I can boot from CD/DVD or USB. When the computer boots and I press F10, computer goes into the BIOS setup but I cannot read the screen and navigate the menus. Any suggestions? If someone can see their BIOS screen, could you tell me which keys to press, in order, to reset the boot order and/or to set CD/DVD and USB to boot before HDD? Many thanks in advance,-Craig-

Answer:Busted LCD - Change BIOS boot order

This is what the LCD looks like. -Craig- 

1 more replies
Relevance 67.24%

How can I change the start order in the BIOS in my C50-A-1HV with Windows 10 ?

More replies
Relevance 66.42%

So, I dont know how but my Z580's BIOS is corrupted. I canot go into the bios or the boot options, even after pressint the right keys. and because i am at my college now, with no leaves left, I can not go to the lenovo service centre. So is there any way to recover my bios or changing the boot order without getting into the bios. and bcoz my first boot device is hdd i cannot boot from cd or usb.plz help.

Answer:Z580 Corrupt Bios : not able to change boot order.

Hi kmpways, welcome to the forums,
 
it will help members to help you if you could post which operating system is insatlled on your Z580 and also which keys you have been pressing in order to enter BIOS.
 
Have you been pressing the keys during a warm or a cold start?  There are some other very similar posts on the boards, the following seems to contain some good tips which you may / may not have already tried.
 
http://forums.lenovo.com/t5/IdeaPad-Y-U-V-Z-and-P-series/Z580-ignores-USB-and-boots-straight-to-Win8...

9 more replies
Relevance 66.42%

Hi
I have some encounted an error (UNMOUNTABLE_BOOT_VOLUME) and I need to reinstall my Win XP. I only have Win XP Cd. But my computer doesnt seem to detect the cd that is in CD-ROW.
I have tried to change the BIOS order. This is what I did to change it. (P.S. I am not sure if I am really changing the boot order or not, that is why I listed out the steps that I have done)
- Press "Del" to Setup
- Go to "BOOT"
- Then see a list like this:
1. Removable Device [legacy floppy]
2. IDE Hard Drive [WDC WD400BB-00DEA07]
3. ATAPI CD-ROW [ARTEC WRA-WA48]
4. Other Boot Device [INT18 Device (Network)]
- Change ATAPI CD-ROW to the top of the list.
-Restarted computer

Result: My computer didn't recongize there is a CD in CD-ROW......
Please help. Thanks~
P.S. I dont have the SIX Win XP start up disks, and I'm not able to get that thing in short peroid of time. Thus, using CD disk is the only way I have to reinstall Win XP.
 

Answer:Change BIOS order, CDROW doesnt seem to be detected....

8 more replies
Relevance 66.42%

Hello,
I have a Lenovo laptop that is about 4 years old. It was working fine earlier today but when I picked it up to turn it on it was powered down and the message came up saying BOOTMGR is missing Press Ctrl+Alt+Del to restart. I tried to restart and enter the bios to change the boot order so I could boot from my windows 7 usb to repair the problem with the command prompt but it would not let me into the BIOS. I tried burning a windows 7 Disc to try that but again it won't boot from the cd/dvd either. I know how to fix the problem but I cannot access the bios to change the settings. What could that problem be caused by? Is the mother board gone? I have seen other posts similar to this but everyone seems to pay attention to the windows part and not answer why they can't access the BIOS. I have tried all the keys, F2, F8, F12, F10, ESC, Del. Normally the F2 key works for entering the bios and the F12 is for changing the boot order on my machine. Please help with this BIOS problem and ignore the Windows BOOTMGR problem.

Thank you

Answer:Missing Bootmgr and can't get into BIOS to change Boot order

Might help any helpers if you fill in your computer specs. Keep in mind the more information you give, the better the chance that someone can or WILL help you... Computer type: Laptop & OS: Nevada???? are not much to go on, no?

7 more replies
Relevance 66.42%

last day i've just bought new machine thinkpad T430, when i try to change default order boot priority in BIOS, the menu is disable, i cannot change anything. Does thinkpad T430 came with default Supervisor password? Does anyone here know the supervisor password default? FYI, when i try to enter BIos, it ask the password, and i just hit Enter to enter the bios. Thank You













Solved!

Go to Solution.

Answer:Thinkpad T430 Cannot change Bios Boot order

It does not come with a password. Where did you buy the laptop?

5 more replies
Relevance 66.42%

So, my friend has just received a laptop that isn't exactly functional at the moment. It only has Ubuntu on it, which is in guest mode, and there is no known password for elevated privileges (that we actually have). So I made her a bootable USB with Windows on it to install. The problem is that we can't seem to get into the BIOS, no matter how quick we are (tried everything). When taken to the GRUB bootloader, this is all we get:


Are there any commands I can use in Grub to get it to see the USB, or is there something I can accomplish in guest mode to change the delay so I can get into the BIOS? Or, is there a way I can help her get sudo access? I thought maybe it could have something to do with fast boot or something, but I have no idea. It's a little difficult because she's across the country, but I know more than she does when it comes to computers, so I'm trying to help.

The laptop is a Lenovo ThinkPad T450. Please feel free to ask me for any other necessary information. I wasn't sure if this would be enough, but didn't know what else to include.
Thank you in advance for your time! ^_^
 

More replies
Relevance 66.42%

Hi Peeps,

I have just bought a C850, and using KIS2013 produced a recovery setup on a usb pen drive. But how do I get the machine to boot from the pen, I can find no way to enter bios to change the boot order. I have been Googling all day and tried every method I could find recommended, non of which worked.

Thanks in anticipation,

Ray

Answer:Satellite C850 - How to change Boot Order in BIOS?

Perform complete shutdown and after you start your notebook again press F12 to enter BOOT menu.
http://aps2.toshiba-tro.de/kb0/TSB2B03EY0002R01.htm

There you will find option to enter BIOS settings.

6 more replies
Relevance 66.42%

I was dual booting Windows 8.1 Update and Ubnutu 14.04 From the windows disk manager I deleted all Ubuntu partitions and rebooted my notebook. I was immediatlly present with the grub rescue promt. Normally this is a quick and easy fix, by booting a windows USB/CD and repairing the windows MBR.  My problem is I can't access the bios or the boot menu to change the boot order. Nothing I've tried has let me get into the bios to set my USB stick as the first boot option.  Using the small recovery key button on the side of the notebook which normally boots the notebook to the screen where you can choose which drive to boot does the same as the power button. There is no bios flash screen or abililty to press any keys before getting to the grub screen.  I've drained the battery and left over night hoping this would reset the state it seems to be stuck in but that also did nothing.  Here is a short video showing what happens when I boot the notebook http://youtu.be/2FpC2Deuawk   

Answer:U300s: Cannot access BIOS to change boot order

peavers wrote:I was dual booting Windows 8.1 Update and Ubnutu 14.04 From the windows disk manager I deleted all Ubuntu partitions and rebooted my notebook. I was immediatlly present with the grub rescue promt. Normally this is a quick and easy fix, by booting a windows USB/CD and repairing the windows MBR.  My problem is I can't access the bios or the boot menu to change the boot order. Nothing I've tried has let me get into the bios to set my USB stick as the first boot option.  Using the small recovery key button on the side of the notebook which normally boots the notebook to the screen where you can choose which drive to boot does the same as the power button. There is no bios flash screen or abililty to press any keys before getting to the grub screen.  I've drained the battery and left over night hoping this would reset the state it seems to be stuck in but that also did nothing.  Here is a short video showing what happens when I boot the notebook http://youtu.be/2FpC2Deuawk   I think the problem is in deleting Ubuntu. According to this video after the deletion of the Ubuntu partitions they must be combined back to the Windows partition.

4 more replies
Relevance 65.6%

I can't acces to cmos to change boot priorityre. HELP !!!

Notebook Satellite S2410-504.

I try to normally press "C" on startup to boot from CD. but it don't work.
F12 too don't help.
I think some set some password on HWUtility, but how disable this pasword?

Please HELP!!!!

Answer:I can't acces to BIOS to change boot order on Satellite 2410

Hi

Try to enter BIOS settings using ESC button at the start up.

7 more replies
Relevance 65.6%

I can't enter bios with F2 or change boot order with F12. It always prompt for a supervisor password that I never set.
The only thing I can do is to hit F11 to enter bios with limited functions where I can't modify anything.
The notebook was brand new and it is working well with W8.1. The problem arose when I tried to boot from a backup dvd to restore the system.
How can I get rid of this problem?
Thanks for any help

More replies
Relevance 65.6%

optiplex 360 unable to change the boot order of the disks in the BIOS.Can anyone help.Already tried to reset CMOS/Jumper and updated the BIOS version to A07.
On startup of machine everytime I need to press F12 then sElect to boot from HDD.
Can anyone help to resolve the issue.

Thanks in advance.
Amar

Answer:optiplex 360 unable to change the boot order of the disks in the BIOS.Can anyone help.

If it's not saving your changes, replace the CR-2032 battery on the mainboard.

1 more replies
Relevance 65.6%

I want to be able to boot on CD or USB KEY at start up but, in the BIOS its not possible to change the boot sequence...


Thank for helping me ! :)

Answer:Not possible to change the booting order in the BIOS on Satellite Satelite A10-403D

Hello Nerach

It will be interesting to know which notebook model you have. By problem description it is always useful to know exact notebook model.

When you switch off your notebook press F12 and let us know what happen exactly. By the way: can you explain us what happen when you try to change boot order in BIOS settings?

3 more replies
Relevance 65.6%

Hello reader/answerer of my questions,
I am having some trouble with my 750 ODN's bios. This bios was an official update (3.6) from the support centre, and almost everything has been fine since (the plot thickens!). I decided one day I wanted to dual boot with linux, in particular Fedora (this is not related to it though).

But, when I burned the disc and tried to live boot (too test it out) I found that the boot order was set to hard drive first! I rebooted and pressed f12 - didn't work.
I tried delete and escape - neither worked. I then tried all the f keys - none of them worked.
Every time it took me to Windows boot menu, and I explored that and I couldn't find anything.

It's also worth mentioning I am running Win 7 SP1.
I tried both PLoP and osloader (too boot from the dvd) - neither worked.
I also can't remember what the key to start the bios was originally - oops!

Also the toshiba logo with instructions never appears.
I would really just like too change the boot order though, the rest of the bios I don't need access too right now.

A separate issue is that Windows randomly decides it wants to check my hard drive, which takes ages, and it won't give up until it gets to check it. I think it may need some medical help.

But, any help, from a qualified doctor or not, would be greatly appreciated.

Thanks in advance
Mitchell

Answer:Satellite L750 BIOS trouble - cannot change boot order

Hi

> I also can't remember what the key to start the bios was originally - oops!

Pressing F2 while powering up the unit would help you to access the BIOS.
But you don?t need to change the booting order within the BIOS. You can do that by pressing F12. This should be done immediately after you have powered up the notebook.
Then the boot menu would appear and you could choose the right boot device.

Does it functions?

3 more replies
Relevance 65.6%

Have a Lenovo H420 desktop that was upgraded about 2 months ago. We backed up everything and want to reinstall Windows 7.

But I can find no way to get into the Setup screen. I've gone to Settings, Update & Security, Advanced Startup and Restart Now. But I have no option to Use a Device. If I choose Troubleshoot then Advanced Options, the subsequent screen has no option for UEFI Firmware Settings.

I've disabled Fast Boot through Power Options in the Control Panel, then tried F2 and the Delete key when starting. Nothing...

The fact that I can't do something that was so easy in Windows 7 is enough reason in itself to remove 10. Throw in the fact that the scanner part of my printer no longer works is just icing on the cake. I have the Windows 7 disk. I just can't figure out how to use it.

Answer:After Upgrade Can't Access BIOS to Change Boot Order for W7 Reinstall

According to the mamual:






2.3 System Setup

System Setup configures the network configuration for the Lenovo Rescue
System to ensure your Rescue System can connect to internet. In addition, System
Setup sets and manages all passwords for the Lenovo Rescue system.

2.3.1 Launch
Repeatedly press and release the F2 key when turning on the computer until the
Lenovo Rescue System open, then select System Setup.

0 more replies
Relevance 65.6%

I've got a Windows 7 upgrade disc, so I first installed Windows XP and now need to boot from this new disc. Because I'm going from 32-bit XP to 64-bit Windows 7, I have to boot from the disc.

I can press F12 to get into the boot order selection screen; but pressing the arrow keys, escape, or enter has no effect. Once I'm on that screen, I just have to turn off the PC because I can't do anything else.

Both keyboards I've tried have been USB. I actually bought a new keyboard in case my keyboard was the issue, but the stores only had USB keyboards--if USB is the issue, I'll have to wait a few days before I can borrow an old keyboard that uses PS2.

Is there any way to workaround this using the USB keyboard I have?
 

Answer:Keyboard doesn't work in BIOS, any other way to change boot order?

Try plugging the usb keyboard into the usb port next to the ethernet port.

.
 

1 more replies
Relevance 65.6%

Have a Lenovo H420 desktop that was upgraded about 2 months ago. We backed up everything and want to reinstall Windows 7.

But I can find no way to get into the Setup screen. I've gone to Settings, Update & Security, Advanced Startup and Restart Now. But I have no option to Use a Device. If I choose Troubleshoot then Advanced Options, the subsequent screen has no option for UEFI Firmware Settings.

I've disabled Fast Boot through Power Options in the Control Panel, then tried F2 and the Delete key when starting. Nothing...

The fact that I can't do something that was so easy in Windows 7 is enough reason in itself to remove 10. Throw in the fact that the scanner part of my printer no longer works is just icing on the cake. I have the Windows 7 disk. I just can't figure out how to use it.

Answer:After Upgrade Can't Access BIOS to Change Boot Order for W7 Reinstall

According to the mamual:






2.3 System Setup

System Setup configures the network configuration for the Lenovo Rescue
System to ensure your Rescue System can connect to internet. In addition, System
Setup sets and manages all passwords for the Lenovo Rescue system.

2.3.1 Launch
Repeatedly press and release the F2 key when turning on the computer until the
Lenovo Rescue System open, then select System Setup.

11 more replies
Relevance 64.78%

We are pushing a new image this summer but we need to make boot and file system changes, my boss wants me to automate this process. the goals are to desable legacy in bios, enable UEFI, select PXE,  change UeFI boot order (usb,cd, NIC, Hd) using the Bios configuration tool at command line. I have the config.ini file from the bios. can I make all those changes at once or do I have to reboot in between enable UEFI and changeing the boot order The why: we are moving from MBR to GPT with the new image Win10, and we save time on the boot by disabling legacy. The boss says so. (the short answer) any tips or suggestions welcome.

More replies
Relevance 64.78%

We are pushing a new image this summer but we need to make boot and file system changes, my boss wants me to automate this process. the goals are to desable legacy in bios, enable UEFI, select PXE,  change UeFI boot order (usb,cd, NIC, Hd) using the Bios configuration tool at command line. I have the config.ini file from the bios. can I make all those changes at once or do I have to reboot in between enable UEFI and changeing the boot order The why: we are moving from MBR to GPT with the new image Win10, and we save time on the boot by disabling legacy. The boss says so. (the short answer) any tips or suggestions welcome.

More replies
Relevance 64.78%

Hi, Im trying to enter to the BIOs setup menu on HP Notebook ba019nr to change the boot sequence.  I already tried with Esc, F2, F6, F10 and others several keys.  which key should I use?

More replies
Relevance 64.37%

This is my problem..

I am curantly working on a Acer aspire 4520. The problem with this computer is that it has sticky keys, first i thought it was the keyboard so i plunged in a usb keyboard and still had the same problems, keys don't react fast, when i turn caps lock on it turns it off and vise versa, when i use the mouse to click something it selects everything on my desktop and opens it all at once.

So i thought it might be a bad OS, so i decide to preform a reinstall of windows vista but when i go to the BIOS it wont let me change the boot order, when i press the keys to chang the order it just makes a beep.

so i went back and did more research and found that some other people are having the same problem and they told me to do i BIOS flash, but that did nothing.. this is the website..
http://geeklord.com/2008/01/19/solution-to-keyboard-lag-problem-in-acer-aspire-4520-laptop/
i am out of ideas, what do you guys think?
 

Answer:Solved: Acer aspire 4520 Sticky key and cant change BIOS boot order.. Need Help..

14 more replies
Relevance 63.55%

Hi dear!

I got an old computer that I used for perhaps one year ago, and what I did to destroy it was to delete the language pack somehow. Now I would like to try to fix it, as I actually need it. But I do have some issues, maybe someone of you guys know. I can start it up all the way to where I choose between safe mode, and so on - then I get the blue screen that lasts the whole 2 seconds, amazingly enough.

I have Windows 7 Installation, that's all I have. When I start up my PC also says two fix the problem:
1 Insert your Windows installation disc and restart your computer.
2 Choose your language settings, and then click "Next."
3 Click "Repair your computer".

Had this been as simple as the system claims, I would have been fixing it myself asap. The problem is that when I put the CD, restart the pc is also nothing happens. So I've searched up a bit, where you can do so in a way pc starts via cd so I can install windows 7 The problem is when I enter the BIOS I can choose between "Information, Main, Security, Boot and Exit ". When I go to BOOT it says "Boot priority order" and that's the list:
1 IDE0 WD
2 IDE1: PIONNER DVD-RW
3 USB FDD:
4 Network Boot: LEGACY PCI DEVICE
5 USB HDD
6 USB CD / DVD ROM:

I can not do anything here, no matter what I press. It's sort of gray text, what I can do about is completely black. So it turns out that they are locked. What should I do ..

Have also tried ALT + F10, the Acer eRecov... Read more

Answer:Acer Aspire 5552G: Deleted language pack - BIOS, can't change boot pri order

11 more replies
Relevance 59.45%

Hi there, I hope this is the right forum for this question.

My son has an i7 custom build computer and the previous owner gummed the computer up good with malware etc. The current setup is Windows 8, but our goal is to install a fresh copy of windows 7 Professional 64-bit which we have purchased "intended for distribution with a refurbished PC".

This is a bit of a project for us, so we are taking our time with it, and hopefully learning something along the way.

We are trying to wipe the HDD completely on the machine, but we are unable to run DBAN to do so, because every time we restart the machine it keeps booting up in Windows instead of DBAN. I have gone into BIOS and changed the order of the BOOT to read from the CD-ROM followed by the USB before the C Drive (I have copies of DBAN on both USB drive and CD-ROM). But it is still not booting. Not sure what to do???

Cheers,

Sean

Answer:can't boot DBAN trying to change boot order in BIOS not working

It is possible you have not created a bootable CD/USB. Use Rufus for example. https://rufus.akeo.ie/

Also provide motherboard make/model please.

7 more replies
Relevance 59.04%

I am trying to delete all the files from an old HP (XH545) laptop running XP. Its screen doesn't work, so I have it attached to a remote monitor. I have both a bootable floppy and bootable cd which have [email protected] Kill Disk. My intention is to boot one or the other and erase everything on the hard drive.

Problem: I am unable to get into my BIOS to change the boot order. Since I have to do a Fn-F5 to switch over to the monitor, I am unable to get there in time to see when to hit F2 to edit my BIOS. I have been trying for several hours to "guess" when to hit it, still with no success. I'm not even sure I would be able to see the BIOS screen anyway - maybe you have to get past that for Fn-F5 to swap out to the monitor.

If I let the system boot normally, I can swap over in time to see it loading Windows XP.

Question 1: Is there any way to change the boot order from within Windows (or from DOS prompts)?

Question 2: Lacking a positive answer to #1, is there any other way to delete all the files from the hard drive so I can dispose of the laptop?

Thanks!

Answer:How to change boot order w/o boot-up BIOS edit?

When you hit the power switch of your laptop at same time start pressing f2 and keep hitting it until you get in BIOS. After getting in BIOS I you know what to do.

4 more replies
Relevance 52.89%

Hello all,
Just bought this laptop from ebay and I am looking to upgrade my current BIOS (A03) to the latest one (A23). But I am not able to install this latest BIOS (A23) unless my current BIOS is (A05). I follow the instruction on Dell support site and trying to download (A05) but it does not show anything in the links.
Where can I find this (A05) BIOS for my laptop?
Here is the instruction provided by Dell Driver and Download:
Note:
1. Please note that if the A04 or before A04 BIOS is currently installed on your system, you must first update to A05 BIOS and then flash to the latest A-rev BIOS.A05 link: www.dell.com/.../DriverDetails2. Please note that if the A05 or after A05 BIOS and before A08 is currently installed on your system, you must first update to A08 BIOS and then flash to the latest A-rev BIOS.A08 link: www.dell.com/.../DriverDetails
Looking forward for your assistant and thanks in advance for all your help.

More replies
Relevance 49.61%

EUFI bios, PC always boots into W7 when I want W10 unless I go into bios and click the drive with W10 on it, then it works. I have tried changing it but when I try to change it in advanced it says not supported but it must be as if I click it then W10 boots up.

More replies
Relevance 49.61%

does anyone know if the order that programs appear in on the start/programs menu list on the desktop in windows 98 can be changed & if they can how to go about it? cheers march

Answer:change the order of programs?

Yes, you can list them alphabetically by right clinging one of them and choosing "Sort by name". Or you can drag them around, if you wish.

5 more replies
Relevance 49.61%

I have a sager laptop that I bought and can't change the boot order. I get into the bios and windows boot manager is option 1 but when I click on it I seem to only get an option to disable or change order with UEFI IP4 or 6 which are options 2 and 3. I'm trying to boot from an extenal dvd drive. What am I doing wrong? Thanks in advance!

Answer:Can't change boot order

Are you trying to do a one time change-meaning you do not want to permanently change the boot order, just for that one action(like booting to install an OS or use a live disk)? most PCs et you do it when you press the power button start spamming(repeatedly pressing) the Escape key, then the boot order menu will pop up, then choose the disk you want.

6 more replies
Relevance 49.61%

help,I am trying to update my bios.need to boot from floppy disc.can get into setup but when I go into bios setup all settings are greyed out,so I cant use arrow keys etc to change. any ideas really need help on this. thanks guys/gals dave

Answer:how to change boot order on xp

Has bios been password protected? If so you could clear it by switching all power off & remove battery for a few seconds. (some say overnight?) Ive never had to do it tho.

3 more replies
Relevance 49.61%

Is there a way I can do this? I want certain accounts to appear at the top of the list. I do not use the Local Folders - so I want that to move to the bottom.TIA.

Answer:How to change the order in which folders appear?

We need more info.  "Local Folders" in what application?  What version of Windows?

5 more replies
Relevance 49.61%

Hello everyone hopefully someone can help me out with my issue .

I was having issues with my laptop and somehow ended up setting my boot device to the CD drive in BIOS . Now my computer will only boot to what is on the CD which is the program windows boot genius . if i don't have the CD in it'll repeatedly turn on and shut down unless i put the CD back in . I know i have to get back to the BIOS to change my boot device back to my HD ? but im unable to do so . F2 is my bios key but that takes me to windows boot manager where i can only select windows and it loads up to the program all over again .
I can access task manager etc and the run window and see my files are still there though . I did a boot file test through the program and none of the files are missing and it recognizes that my PC was on windows 8.1 .
 

Answer:Can't Change Boot Order

6 more replies
Relevance 49.61%

fitted a new hard drive due to virus and want to reinstall windows but went into bios to change boot order but it wont let me it has enter in red alongside all i can do is press it it wont let me go anywhere else ,help please
 

Answer:cant change boot order

9 more replies
Relevance 49.61%
Question: change boot order?

is there a way to change the order in which applications i have set to boot load at start up? i want my antivirus to load first before anything else, and it did until i installed a printer.... is it possible to change this?
 

Answer:change boot order?

jayno20 said:



is there a way to change the order in which applications i have set to boot load at start up? i want my antivirus to load first before anything else, and it did until i installed a printer.... is it possible to change this?Click to expand...

What difference does it make which way they load as long as they do,.?

Regards
 

2 more replies
Relevance 49.61%

So i took a peak in my bios screen today and i see the dvd drive is listed as the first boot option. I wanted to change it to the hdd, but it wont let me. This is the first time i have encountered this. I can select the menu, and i can move the arrow up and down to select the "new" first boot, but when i hit enter and i am returned to the main screen the order still says dvd drive.?...what gives, any ideas?
thanks
 

Answer:Cant change boot order/xp pro

I'm running two DVD drives and three harddrives.
All the drives are SATA and I'm not using RAID.
I set the "CDROM" as third boot device in "Boot Device Priority" and disable the 4th.
Set which HD to boot off in "Hard Disk Drives".

Not sure why yours won't save HD as first boot device.
 

4 more replies
Relevance 49.61%
Question: change boot order?

is there a way to change the order in which applications i have set to boot load at start up? i want my antivirus to load first before anything else, and it did until i installed a printer.... is it possible to change this?
 

Answer:change boot order?

Disconnect from Internet before trying:

Uninstall both AV and printer.
Install printer.
Install AV.

If that does not work, there is a way to detect load order with a utiliity by that name from http://www.sysinternals.com. You can see the actual load order only with that kind of utility. Installing the anti-keylogger software SnoopFree indicates that its service is the first item to load before any other system service. So, there is a way to have it your way that the author of Snoopfree knows about - but, I have since forgotten, but that's the best example of the situation you want that I know of.

A bit of research should uncover the technique used.

-- Tom
 

2 more replies
Relevance 49.61%

hi !, i am running a system with intel core 2 duo processor and gigabyte motherboard. In my BIOS the first boot device is HDD, now i want to change that to CD/DVD, but i cant change them...

after entering Advanced BIOS settings -> Hard disk boot Priority [Press Enter]

but when i press enter it is showing the order, but those are disabled, i tried +, -, pu, pd but they didn't work. Does any one know the solution...?
 

Answer:How can I change my boot order

You're looking at the wrong item. Go down one line until you see "First Boot Device." Change that to the appropriate CDROM device. You can also set the second and third boot device if you wish. What you are doing now is choosing which hard drive (and hard drives only) will boot ahead of the other hard drives. So if your hard drive is selected as the second boot device, this will tell the system which hard drive to look at first. That is, if you had more than one. If you only have one hard drive, that would be unnecessary.

You may also press F12 to temporarily change the boot order for that one time only without entering the BIOS.
 

5 more replies
Relevance 49.61%
Question: Change Boot Order

Just added a new Samsung M.2 SSD that the OS sees in the device manager. I've got a copy of the recovery image made and saved on a USB 3.0 drive.If I boot from the USB drive and run the recovery, how do I get make it so the SSD is the default boot device. When it goes into the recovery options from the USB flash drive, it doesn't specify which drive to use.  The BIOS/ UEFI  options aren't much help either. I'm just finding the HDD just way too slow.Thanks,Sheila













Solved!

View Solution.

Answer:Change Boot Order

I found the solution!  Go to the BIOS and under the System Configuration menu, I had to enable "Legacy" boot. When I restarted the laptop, it booted to the new Samsung  M.2 SSD by default as I'd used the Samsung migration tool to clone the main hard drive onto the SSD already. Now boots lightning fast! 

6 more replies
Relevance 49.61%

Hi, sorry if this is the wrong section, I'm new and didn't see a request section.
I wanted to know how to change the default name sort order from this:
A 2
A Modified
A
To:
A
A 2
A Modified
In windows 7.
Thanks in advance.

Answer:Help: Change Name Sort Order

Hello Swordzero, and welcome to Seven Forums.

You might see if this may be able to have sorted the way you want after appying it.

Sort Order - Numbers in File and Folder Names - Vista Forums

Hope this helps,
Shawn

9 more replies
Relevance 49.61%

Hi  Is there a way to change the order in which services or other things start when the laptop is initially switched on? While I'm waiting for the laptop to finish booting up it seems the last thing to work is the trackpad, which is really frustrating.  I have to wait for it to settle down before I can use the trackpad properly. I've looked under 'startup' and there's nothing there that I don't need, I only have the items I want ticked.  An example would be perhaps to make the touchpad service start before bluetooth/apple services/print spooler/etc. which I don't need straight away. I have a G580 2689 running windows 8. Thanks.

More replies
Relevance 49.61%

Hi,

Is there a way to change the order of programs that auto start when system loads!

For example, I want to have MalwareBytes and Antivirus starts first before internet connection...or some others programs

MalwareBytes first because I have PRO version...

Hope you understand what I want to do, I searched it over internet, but it is confused

Thx in adv

Max

Answer:Change startup order

Good question - I'd like to know how as well I know how to use MSCONFIG to edit startup items, but not how to reorder.

9 more replies
Relevance 49.61%

Using my OEM cd for xp home, I cannot boot up with the cd.

I have gone into boot up list, h/lited cd rom (which is 3rd in my case) c/o enter, pressed f8 to save but it boots up as normal desktop on restart.

Any advice please
 

Answer:cant change boot order

Are you sure it's F8 Gudda it's usually F10.
 

2 more replies
Relevance 49.61%
Question: Change boot order

I need to change the boot order in order to fix a problem with start up. How do I do that?

Answer:Change boot order

You mean changed the boot order of your Physical Drives? If so, you want to hit F2 or F8, sometimes DEL (depending which type of machine you have) and you should enter BIOS when youre computer is booting. Let me know if that helps.

8 more replies
Relevance 49.61%

Wireless NetWork needs to load before all access attempts not after.

OS Name Microsoft Windows XP Professional
Version 5.1.2600 Service Pack 2 Build 2600
OS Manufacturer Microsoft Corporation
System Name MICK
System Manufacturer VIA Technologies, Inc.
System Model KT400-8235
System Type X86-based PC
Processor x86 Family 6 Model 8 Stepping 1 AuthenticAMD ~1666 Mhz
BIOS Version/Date Phoenix Technologies, LTD 6.00 PG, 1/10/2003
SMBIOS Version 2.3
Windows Directory C:\WINDOWS
System Directory C:\WINDOWS\system32
Boot Device \Device\HarddiskVolume1
Locale United States
Hardware Abstraction Layer Version = "5.1.2600.2180 (xpsp_sp2_rtm.040803-2158)"
User Name MICK\Administrator
Time Zone Central Daylight Time
Total Physical Memory 512.00 MB
Available Physical Memory 438.08 MB
Total Virtual Memory 2.00 GB
Available Virtual Memory 1.94 GB
Page File Space 2.40 GB
Page File C:\pagefile.sys
 

Answer:How do I change load order?

I think that using Windows' Wireless Zero Configuration (WZC) is the quickest wireless start you can get.
 

1 more replies
Relevance 49.61%
Question: Change disk order

Hello,

I have a question.

I want to change my disk order. Actually i have this:

http://img99.imageshack.us/img99/8701/89585758.jpg

I want to put disk 1 to disk 0 and disk 0 to 1.

I try to change that at bios but after save windows don't boot. So, i put all was before.

Someone can help me?

Regards.

Answer:Change disk order

  
Quote: Originally Posted by csoyen


Hello,

I have a question.

I want to change my disk order. Actually i have this:

http://img99.imageshack.us/img99/8701/89585758.jpg

I want to put disk 1 to disk 0 and disk 0 to 1.

I try to change that at bios but after save windows don't boot. So, i put all was before.

Someone can help me?

Regards.


Hi and welcome to seven forums

It may be more trouble than it is worth. Are these drives built into a tower?
Why do you want to change the order?

Thanks

Ken J

4 more replies
Relevance 49.61%

Hello all i really need some help

I was having issues with my laptop and somehow ended up changing my boot device to the CD drive in BIOS . Now my computer will only boot to what is on the CD which is the program windows boot genius . if i don't have the CD in it'll repeatedly turn on and shut down unless i put the CD back in . I know i have to get back to the BIOS to change my boot device back to my HD ? but im unable to do so . F2 is my bios key but that takes me to windows boot manager where i can only select windows and it loads up to the program all over again .
I can access task manager etc and the run window and see my files are still there though . I did a boot file test and none of the files are missing and it recognizes that my PC was on windows 8.1 , im really stuck though .

Answer:Can't Change Boot Order

Instead of f2 try escape for the one time boot change and see if the option to get into bios is there.

35 more replies
Relevance 49.61%

I want to change the boot order so that if I have  USB plugged in it will boot off that. I can get it to boot off the USB by interupting the boot and selecting the USB, but I want it to do that automatically. I can get in to the BIOS setup and find the Boot section but it only seems to give me options of UEFI or Legacy, no option for USB. I'm used to computers that have sensible options of Hard Drive, Optical Drive, Floppy Drive and USB.

Answer:How do I change the boot order

hi Nina_W,
 
Depending on the model and the BIOS version, newer Lenovo systems are preloaded with the Unified Extensible Firmware Interface (UEFI) and has a feature called Secure Boot (which is enabled by default) to protect the OS from loading any third party boot loaders / drivers (or even viruses) from loading during the boot process (this includes booting from the USB).
 
To automatically boot from a bootable UEFI USB flashdrive, the BIOS must have the following settings set:
Security Tab:
Secure Boot = Disabled
 
Boot Tab:
Boot Mode = UEFI
USB Boot = Enabled
Boot Sequence = USB Key
 
Exit Tab:
OS Optimized Defaults = Other OS
 
If the USB Boot / Boot Sequence is missing in the BIOS, you will not be able to automatically boot from a bootable USB flashdrive. Instead, you will need to press F12 during boot-up and choose the USB key or follow this guide to boot from the device within Windows.
 
 
Regards

5 more replies
Relevance 49.61%

Hi, folks! I'm pretty familiar with MSCONFIG, but it doesn't indicate what ORDER the services/applets load in the background during startup.
I would like to consider changing the order. Such as loading my firewall and anti-virus before anything else.

Is there a safe applet or program out there which will enable me to edit the startup order?

Thanks for your suggestions and assistance!

Sandy Gerli

Answer:startup order, how to change it?

I don't think you can change the start up. If Windows was more like Unix/Linux then yes you could via /etc/rc.d, but Windows doesn't have that capability.

2 more replies
Relevance 49.61%
Question: Change boot order

I need to change the boot order so that the BIOS polls the CD/DVD drive for a bootable disk and starting from there.So the boot drive order should be:CD/DVDHDD I've gone into BIOS and found the Boot Drive Order section. The first item listed there is Windows Boot Manager with choices for USB drive, network, and uefi drives listed after. Any help would be greatly appreciated. 

More replies
Relevance 49.61%
Question: Change file order

How do I make file numbers change order, as in slide show ?

Answer:Change file order

I am sure you know what you are asking but I don't so perphaps a few more words describing what you see in a slide show and how that relates to how you want to see your files sorted would be in order.

3 more replies
Relevance 49.61%

I accidentally deleted some partitions in my U410 and now I need to completely reinstall the windows. However every time that I change the boot order at the BIOS, (putting USB as first and the 'windows boot manager' as last') and click on 'Exit Saving Changes' it simply do not save my changes! If I go again to the bios the windows boot manager goes back to the top and I can't boot from the USB. Is there a simple solution for this?  

Answer:Can't change boot order

Hi bragalucas,
 
Welcome to Lenovo Community Forums!
 
Can you try switching the BIOS to these options,
 
1. Boot into the BIOS and set the following settings:
 
Exit Tab:
OS Optimized Defaults = Win7 OS or other OS
 
When finished, hit Load default settings (just right above it) then set these additional settings:
 
Security Tab:
Secure Boot = Disabled
 
Boot Tab:
Boot Mode = Legacy
Boot Priority = Legacy First
 
2. When finished, hit Fn+F10 to save and exit.
3. Restart the computer and start tapping F12 to pull up the boot menu, There you can select the USB.
 
This should let you select Legacy Devices such as USB, 
 
Regards
Solid Cruver



Did someone help you today? Press the star on the left to thank them with a Kudo!If you find a post helpful and it answers your question, please mark it as an "Accepted Solution"! This will help the rest of the Community with similar issues identify the verified solution and benefit from it.Follow @LenovoForums on Twitter!

2 more replies
Relevance 49.61%

How to change the boot order of OS's?

My boot order shows win2k on the top position but would like my winxp to be the top position so that way it will automatically boot into XP after the time runs out. Any idea how to change the boot order?
 

Answer:How to change the boot order of OS's?

In Windows XP:
Right Click on "My Computer"
Go To the "Advanced" tab
Under "Startup and Recovery", click "Settings"
From the drop down menu, choose Windows Xp
You can also set the time to display the Operating System screen.

Hope that helps.
 

3 more replies
Relevance 49.61%

I am sure I am going to get a few "why don't you use the Search" or "try Google" suggestions, but the problem is I am not 100% sure on what to Google for this.


I have a Server 2008 R2 Box doing my DNS, and DCHP duties among a few other things. Before I started using the DHCP on the windows box, i was using PFSense for DHCP and only DHCP at the end of its life (kind of overkill for DHCP).

So my question is, can i change the order that my Windows DHCP server hands out IP address?

For example, right now it hands out lower numbers first like 1,2,3,4,5,6,7,8,9,10 but i would rather it went 10,9,8,7,6,5,4,3,2,1 as my old PFSense box use to do.
 

Answer:Change order of DHCP

Why?
 

12 more replies
Relevance 49.61%

When I rebuilt my dead Compaq PC, I must've hooked the IDE cables to the two CD drives backwards, because the one on top (usually the first letter, like D: ) is E:, and the bottom is D:. Can you reverse the letters of the drives without rewiring them?

Answer:Change drive order in XP...is it possible?

Right Click on my Computer>Manage>Disk Management.

Right click on teh drive change it to a letter further down then right click on the drive that you want to have that letter. Then go back to the original drive and give it the 2nd drives letter.

Or give them any letter you want. The only one you cant change this way is the drive with the Windows isntall on it.

1 more replies
Relevance 49.61%

I have a Lenovo ideapad 300-I7ISK Laptop Windows 10 x64Bit. I need to know how to boot from my CDDVD Drive and my USB Flash Drive as well as how to go back and boot from my Hard Drive. Please help me!. I am new here and i cannot find any help. This is the first time i have ever posted a question on a forum. I am bbg3712. Please reply to me concerning these questions!

More replies
Relevance 49.2%

I have set up calendars in excel. I would like to tab through one month then to the next but because the months are side by side the tabs run straight across the page. Tab order could correct this so that I could complete one month then mopve to the next.

Answer:I would like to change the current tab order in my spreadshe

Just so you know this is what the Tab key does:Tab: Moves one cell to the right in a worksheet.orMoves between unlocked cells in a protected worksheet.orMoves to the next option or option group in a dialog box.orShift+Tab moves to the previous cell in a worksheet or the previous option in a dialog box.orCtrl+Tab switches to the next tab in dialog box.orCtrl+Shift+Tab switches to the previous tab in a dialog box.MIKEhttp://www.skeptic.com/

15 more replies
Relevance 49.2%

How do I change the order of programs that open during start-up?
 

Answer:Change start-up order in Windows XP

8 more replies
Relevance 49.2%

is there a way to set the default sorting in Now Playing in WMP11 to sort by filename? when i select multiple files and add to now playing list they seem to show up in a random order. I want them to show up by file name order WITHOUT having to change the sort option every single time.
THX
 

Answer:change default sort order in WMP 11??

I think you would have to create your own playlist if you want the songs in a specific order.

Sorting the songs is done randomly, I dont think there is a way to change this other than making your own.
 

3 more replies
Relevance 49.2%

When I got a Win7 computer from Dell, McAfee was already installed.
How can I change the sequence of the booting order of startup programs.
For example, I would like to place McAfee proram at the end of the booting sequence for the startup programs. hummer

Answer:How to change the order of startup programs

Check out this app. Autoruns for Windows

9 more replies
Relevance 49.2%

Can I change the order in which my startup items start? At the moment ZoneAlarm seems to start last of all, so my PC may not be protected for a minute or two. I'd like it to start before some of the other items.Christopher

Answer:Change order of startup items?

It's already working before you see the icons.click here

2 more replies
Relevance 49.2%

HiI can change the boot order of hdd, CD, usb etc but I currently have two hdd's fitted, both with Win 10 installed.How do I set one as the default?Normally laptops defualt to the one fitted to the original hdd sata port and not the one fitted to the optical drive sata port, but not this machine! Thanks.   

Answer:HP 15-n096sa change hdd boot order

So which one is it defaulting to? The optical drive port?

5 more replies
Relevance 49.2%

Is there any way to change the order of the bookmarks in Edge? I can't seem to drag and drop anymore.

Matt

Answer:Change order of bookmarks in Edge?

I want to know as well. I wish it didn't show the urls. Very hard to read a list of bookmark names and urls. It's a mess

1 more replies
Relevance 49.2%

I have xp on two partitions but I would like to change the boot order.Is it possible.If so how.

Answer:can I change dual boot order

can anyone help

6 more replies
Relevance 49.2%

I remember this from the past but I don't remember how to fix it. I did some searching online but I don't know what this is called. I found one reg fix but it didn't work. Anybody have the correct registry fix for this?

My files are sorting as so;
1,
11,
12,
13--->19,
2,
20,
21--->29,
3,
30,
etc

I want regular ascending.
 

Answer:Change Windows 7 Sort Order from 1,10,11 to 1,2,3

Sort by name should sort 1, 2, 3, 4, 5, ..., 11, 12, ...

If it doesn't, then there's something else wrong.
 

5 more replies
Relevance 49.2%

Whenever my computer comes back from standby mode, it seems the last process to revive is my wireless mouse/keyboard. Is there a way to have these revive first or are they just, by nature, slow to activate?
 

Answer:Can You Change Order of Process Initialization?

It just takes time for your system to completely wake up.
How quick are you when you first wake up?
 

2 more replies
Relevance 49.2%

I was hoping to find a way to change the order of the items in the context menu under windows xp sp2.

As an example, when i right click on MY COMPUTER, the order of the items should be:

1. Open
2. Explore
3. Search
4. manage

For some reason, Explore is at the top, followed by open, search, and manage, and it's driving me nuts.

I have searched thru the registry to find the entries, but when I get there I can't find any way to change the order of the menu. I have followed the path:

HKEY_CLASSES_ROOT\*\shellex\ContextMenuHandlers

but once there, I have no options to change.

Am i even close? Is there another registry key I am missing? Any ideas would be helpful!
 

Answer:How to change context menu order - Help!

Look Here ---- Better Export It And Paste It in This Thread

HKEY_CLASSES_ROOT\CLSID\{20D04FE0-3AEA-1069-A2D8-08002B30309D}
 

1 more replies
Relevance 49.2%

When I boot up (XP Home Edition, SP2), the icons in my quick-launch toolbar appear in the following order: Broadband internet connection (2 vertical green arrows), other plug-in connection (1 horizontal green arrow, presumably because I've got a USB hub), speaker volume, AVG, then Kerio firewall.Since I've installed SP2 I've occasionally had a message, prior to the AVG and Kerio icons coming up, saying that my computer may be at risk because I've no firewall.This made me think, is there any way I can instruct Kerio and AVG to load before my broadband connection does?

Answer:Can I change the order of boot-up programs?

I know I can unplug my modem, and only plug it in after everything else has loaded. But is there no electronic way of achieving this?

5 more replies
Relevance 49.2%

Can anyone tell me an easy way to change the order of the programs at startup. Currently the first program that loads is my Pop Up Blocker. I'd like to move it further down or even to the end of the startup order.

Is their a program that would allow me to change the order?

One other minor thing I would like to change is when I go to the Internet Explorer, it opens in a small window. I would like to have it open maximized as a default. I can't find any where to make that happen. Any Suggestions?
 

Answer:Change order of programs in startup

There are 2 ways to review startup info.

1)MSConfig allows you to enable/disable programs, but doesn't allow you to set the order of the load!

2) using regedit.... the info is in two places as there are programs that start for the machine as a whole and programs that start for each individual user. The paths to this information are..

HKEY_LOCAL_MACHINE
...Software
......Microsoft
.........Windows
............CurrentVersion
...............Run

HKEY_CURRENT_USER
...( same as above )

I've never tried it, but it would make sense that if you changed the order of the registry entries that you change the order of the load!

Regards......
 

5 more replies
Relevance 49.2%

Guys, I feel stupid.  A frustrating place to be.  Please bear with me if I am doing something stupid.  I added a mSata second drive.  Works fine.  Lenovo X220, Bios 1.16.  PC boots from the new drive.  I don't want an operating system on the new drive, just want it for storage.  So I entered the bios by pushing the blue thinkvantage button and can't find a way to permanently change boot order.  I hit F12 to TEMPORARILY change boot order, every time I boot the PC.  Major PAIN!  I tried to enter the Intel Boot Extension Management Engine, but it needs a password and I don't have a password.  Any thoughts? 













Solved!

Go to Solution.

Answer:How to change the boot order? Frustrated!!!

Hi,
 
I don't have access to the same BIOS so this is a guess based on my other Thinkpads:  get into BIOS and go to the Startup tab (or similarly named tab).  On that page there should be an entry like ">Boot"  That is Boot with an arrow-like thing next to it.
 
It looks like the title to the page but can be expanded to the boot list by selecting it.  There should be an option there to move bootable devices up and down in the list.
 
If this isn't what your BIOS looks like, sorry for wasting your time.
 
Z.
 
[edit] "click"

9 more replies
Relevance 49.2%

if I have two, or for that matter, 'n' SATA drives in a system, and one is bootable, the rest not, how come my GX620 optiplex/dell doesn't just go down the chain and boot anyway?
it seems [BIOS??] to assume only one SATA device in the overall boot scheme. SATA doesn't deal with master/slave stuff, right? its a marxist system....
 

Answer:Any way to change SATA boot order?

Most Mobos will let you set boot sequence, as in CD, floppy, hard drive, etc. You will also find you can often change the overall structure should you have more than one HD, so that you can chose which is the bootable disk.
You need to set each item as bootable- if your boot list has Hard drive and nothing else it wont look anywhere else. Computers are stupid, and do EXACTLY what you tell them. Not their fault that the idiot is at Dell
 

2 more replies
Relevance 49.2%

hello i have win 8.1 pro x64.i want to know if i can change the display order of disks icons manually.usually the c drive appears first(from left to right),second cdrom icon and next the external drives.can i change that with drag and drop?(i remember that i can do it in vista)

Answer:change display icon order

You can try to sort or group them

Sort by, Group by, and Arrange by Items in Windows 8 File Explorer

2 more replies
Relevance 49.2%

CANT SAVE CHANGED BOOT ORDER on z585
I am having same problem. Tried almost everything I can think of.
I was accidently forced to do a win10 upgrade when locked into the blue screen saying device isnt connected (000225 error code.)
No trying to boot from a USB or DVD but it refuses to try those before hard disk and fails boot.
It will see the usb device in the list ( tried 2 types ) and recognises it as say toshiba device, but will not boot from it, and when ever i try to sve that as the fist option, with f10, while it says ok, never saves it, 
Any help much appreciated.
 
Thanks
Lump1
 
Mod's Edit: System model added to front of Subject line to improve visibility / clarity. Moved posting to it own thread in the Lenovo Z series notebook forum from the Lenovo U/S series notebook.

More replies
Relevance 49.2%

Fixing a Dell Latitude CPi for a colleague. Problem is the system freezes during the XP splashscreen. I went to change the boot order to CD so I could repair the install, but the BIOS isn't letting me change the setting. PII-233 CPU. 64MB sys mem, 2MB vid mem, 512 KB L2 Cache, 3253 MB HDD.
 

Answer:Need to change boot order to fix XP install.

11 more replies
Relevance 49.2%

How to change context menu order - Help!
I was hoping to find a way to change the order of the items in the context menu under windows xp sp2.
As an example, when i right click on MY COMPUTER, the order of the items I would like is :
1. Open
2. Explore
3. Search
4. manage
However Explore is at the top, followed by open, search, and manage.
I have searched thru the registry to find the entries, but when I get there I can't find any way to change the order of the menu. I have followed the path:
HKEY_CLASSES_ROOT\*\shellex\ContextMenuHandlers
but once there, I have no options to change.
Am i even close? Is there another registry key I am missing? Any ideas would be helpful!
 

Answer:Change Context Menu Order

I am sure someone will give you a helful answer, but maybe you should repost in the XP Forum.
 

3 more replies
Relevance 49.2%

in graphic programs, explorer, etc when I right click I get a drop down box showing

"rename"

well right above that is "delete" and I'm frequently getting the two mixed when clicking, tho I don't usually actually delete cause I catch that first.

Is there a way to seperate those and reorder the drop down list so they are farther apart. It gets to be a nuisance sometimes when I am rename picture files.

Answer:change order in right click drop down box...?

Not an answer to your question but a still a solution of sorts.

Press F2 to bring up the rename dialog. No confusion that way

3 more replies
Relevance 49.2%

I have a Acer aspire 5735Z laptop on windows vista that I want to install windos xp on. I rebooted and pushed S2. when I get to the boot options it won't let me change the order to boot from cd. I used 2 different windows xp disks. Can anyone make suggestions on how to get this to change so I can boot from the cd drive and load windows xp and get rid of vista?

Answer:computer won't change the boot order to cd

The boot order is changed in the BIOS which is probably F1 or the delete key. Search Google for the roll back method before you try to install XP & make sure that you can get all the Acer drivers for XP first. How do you know when a politician is lying? His mouth is moving.

2 more replies